HanesBrands / Sara Lee · Maintenance & Reliability

Maintenance Reliability Transformation

Planning and scheduling improvements used to reduce equipment downtime and maintenance cost at a Puerto Rico manufacturing facility.

Business Challenge

The Ponce manufacturing operation required stronger maintenance planning and scheduling practices to improve equipment availability and control maintenance cost.

Approach

  • Facilitated and implemented revised maintenance planning and scheduling techniques.
  • Strengthened the operating discipline around work preparation and execution.
  • Connected maintenance routines to measurable equipment and cost performance.
  • Applied a practical reliability mindset grounded in planning, control and follow-through.

Measured Results

30% reduction in equipment downtime.

$150K reduction in annual maintenance cost.

Why It Matters

Maintenance improvement is not only a technical problem. Planning discipline, material readiness, execution standards and performance feedback are essential parts of the reliability system.